Red Hat tests OpenShift Virtualization 4.22 upgrades with 10,000 active VMs
The Scale Lab report spells out what engineers tested during upgrades and node drains, while keeping the supported cluster limit at 10,000 VMs.
Red Hat’s OpenShift Virtualization performance team published an overview of its 4.22 scale campaign on Nov. 20. One test puts a number on the maintenance workload: engineers ran cluster upgrades with 10,000 active virtual machines across 100 nodes, with guests actively writing memory. The report describes what the team tested, but leaves measured rollout times and detailed results for later posts.
What Red Hat tested
The previous OpenShift 4.20 campaign generated more than 30 bug reports. The authors say fixes that landed in 4.20 updates and later releases addressed issues including stalled node drains, migration completion detection, and memory limits in Advanced Cluster Management search at 10,000 VMs. The 4.22 campaign built on those fixes by testing how the platform behaved during maintenance, rather than measuring how many VMs it could start.
The team tested parallel node drains and examined how OpenShift Data Foundation disruption budgets and Ceph recovery interacted with the rollout. A separate migration exercise used a 240-worker environment with higher migration limits and thousands of migration requests to stress the system. The numbers describe different tests, not one cluster configuration or a recommended concurrency setting.
What the scale numbers mean
Red Hat’s published support limit remains 10,000 VMs per cluster. The lab pushed density to 40,000 VMs to look for control-plane bottlenecks; that experiment did not raise the support limit. The report also found that placement matters independently of cluster totals: in one test, putting thousands of VMs in a single namespace drove one virtualization controller pod to roughly 100 GB of memory. The team filed a bug for that observation.
For platform teams planning a large migration or upgrade, the useful takeaway is to test maintenance under representative load. Rehearse node drains with active guests, not just idle VMs, and track drain completion and storage recovery alongside workload health. Test the namespace layout you intend to run as well as the total VM count. The overview identifies what to measure, but it does not provide enough timing data to set a maintenance window from Red Hat’s results alone.